Can-Do-itis, Can it be cured?

When we talked about the requirements for an Arctic Patrol Vessel, I had suggested that in this harsh and unforgiving environment, there would be circumstances when we would want to launch two helos or at least have a second helo on standby on deck. (Long range, far from help, marginal weather.) The response was that one helo would be enough.

Spoken like a true operator. Yes, Coast Guardsmen take calculated risks all the time. There is a mission to do. We have only one helo available. It would be better to have two, but that is not an option, so we go with one. We get away with it, so next time, we also go with one without even thinking about it. It becomes the standard.

But step back.

When we are in the procurement phase, we need to change our mind set. Having two helos is an option. The question is fundamentally different. I think the Coast Guard has been suffering from “Can-Doitis.” This is why we are still using ships that should have been replaced 15 years ago. Why our budget is being cut while the Navy’s is being increased. Why we must now decommission five ships before their replacements come on line. (Frankly, I think the decision to do so reflects refreshing realism on the part of the leadership, but it is why we got in this mess.)

I hope the operators’ attitude never changes, but when the operator moves to the position of stating our needs, the question has to change. Not, “If I have only this, are the risks acceptable?” but “What do we really need to do the job safely, reliably, and consistently without making unreasonable demands on our people?”

If we go to the administration or Congress and ask for the minimum we can get away with, we will never get more than the minimum. Worse yet, they will assume we have padded our request and will be only too happy to cut it further.

When our leadership decides that we can make do, they are not deciding for themselves. They are deciding for young people that we frequently demand too much of, the engineers that are working 18 hours a day, when they should be with their families, to get an ancient and unreliable plant ready to sail thousands miles from home, for the crew of a 110 that is, in fact, going in harms way, or the crews of cutters responding to the earthquake in Haiti only to have their ships fail them.

It is difficult, but going from the field to deciding what the service should ask for, means going from heroic, impetuous youth to being an overprotective parent looking out for the safety and well being of our most important asset, our people.

USS Newcomb (DD-586)

After having read William R. Wells, II (Wells2)’s story of First Lieutenant (later Commodore), Frank H. Newcomb, USRCS’s, performance during the Spanish American War, in which Wells2 noted that the Navy had named a destroyer after Commodore Newcomb, and seeing reference to USS Newcomb on the Navy History and Heritage Foundation Facebook page (now a broken link–Chuck) in connection with with the first heavy Kamakaze attacks of the Okinawa Campaign, I had to find out more.

The ship had a very short but illustrious career. She sank at least one and maybe two Japanese subs, lead a torpedo attack that sank a battleship, and survived five kamakaze hits. You can read about it here. They did get some things wrong with regard to the Battle of Cardenas, and the ships anti-aircraft battery, but the rest of the information appears reliable, and some of the pictures of the damage to the ship are very impressive.

This gives us another reason to name a cutter after Newcomb. Not only would we be honoring one of our heroes. We would be honoring this brave ship and our ties with the Navy.

UAV info (from the manufacturer)

We have all heard that the Coast Guard is evaluating “unoccupied aerial vehicles,” UAVs, UASs, or whatever we are calling them lately. Ran across this recently and thought some of you might be interesting. Particularly liked the fact that the videos included a launch, and in the case of the Scan Eagle video, a recovery on a very small vessel.

Scan Eagle
Integrator

At any rate it offers a sample of what might be in the works. 24 hour endurance, synthetic aperture radar, electro-optic/IR turret, in systems that can weigh less than 50 pounds, and we can take it off and recover from something as small as Fast Response Cutter.