The hearing recorded above was held 7 June. The original video was found here. That page also provides the chairman’s opening statement and links to the witnesses’ written statements that are also provided immediately below. The video does not actually start until time 4:30.
Below, you will find my outline of the highlights.
Witness List:
|
The GAO’s written testimony is particularly comprehensive. They report that new assets (NSCs and FRCs) are not meeting planned availability. There have been an unexpected number of engine replacements. In the case of the National Security cutters it appears to me the down time was predictable, a normal part of introducing new ships and availability should return to planned levels as more ships join the fleet. The known defect, that when operating in waters 74 degrees or warmer, the NSCs cannot maintain maximum speed has apparently not been corrected. Max speed must be reduced two to four knots to allow adequate cooling.
Planning Documents: The Congressional Representatives repeatedly complained that they were not getting an unsensored statement of the Coast Guard’s needs. It appears the Coast Guard is not being allowed provide this information. Rather it appears the GAO is telling the Coast Guard how much they will be getting and told to submit a budget that fits the predetermined amounts. Reportedly the Unfunded priorities list will be provided by the end of June. They also asked for the 5 year and 20 year plan (1h04:30). Coast Guard representatives were repeatedly told the Coast Guard does not say what they really need, that information provided by the Coast Guard is inadequate for the sub-committee to make decisions (1h48m).
It appears that the GAO continues to ask the Coast Guard to plan procurements based on historically low AC&I appropriations that were adequate for a time because of the sporadic character of Coast Guard ship building. They acknowledge that the current budget is not realistic. (43:45)
The Coast Guard is now consistent in requesting $2B in the AC&I annually and a 5% annual increase in its operating budget and that we need 5,000 additional active duty billets and 1,100 addtional reservists. There was a statement from one of the Representatives to the effect, We need you to fight for yourselves (1h50:30). The representatives were informed that the 5 year, 20 year plans and unfunded will be delivered together (1:56)
My opinion: we need a regularly revised Fleet Mix Study. That in turn should feed directly into a 30 year ship and aircraft procurement plan.
Webber Class WPCs: The Coast Guard is reportedly pushing WPCs operations down as far as the coast of South America. (50:00) This confirms my earlier speculation that these ships would be operated in what had been WMEC roles. Six cutters for CENTCOM The representative confirmed that they had approved procurement of six Webber class requested by CENTCOM. Apparently their approval was in the form of the Coast Guard reauthorization bill which has still not been made law. Adm. Ray stated that these would be in addition to the 58 currently planned (9:30) and it is not clear how or when they would be funded. Adm Stosz indicated it was not certain six Webber class would be the Coast Guard’s choice in how to fill this requirement and the question required more study. (1h11)(1h41m).
Shore Facilities: Reportedly there is a $1.6B shore construction backlog. $700M shore facilities maintenance backlog. Some infrastructure improvements that directly support new operational platforms.are being accomplished under the platform programs (55:00) The representatives asked, why we have asked for only $10M if the total shore facilities backlog is $2.3B?(1h35)
Icebreakers: The possibility of leasing the commercial icebreaker Aiviq is still being considered. (1h27) The owners have offered a plan for Ice trials and the Coast Guard has said it would be interested in observing. (1h29:50)
Great Lakes Icebreaker: Rep. Lewis brought up icebreaker for Great Lakes.Adm Ray says for now we will address with the existing fleet. (1h00:30) Priority is still Polar Ice Breakers.
eLoran: There seems to be considerable interest in eLoran to deal with GPS vulnerabilities. (1:22) The Navy League representative supported the need. The Re-Authorization Bill directs Secretary of Transportation to initiate E-Loran testing. There was a clear anticipation that the Coast Guard would support implementation.
Coast Guard Health Care: Looks like the Coast Guard heath care records system which reverted to paper now may be able to piggy back on the VA’s conversion to the DOD system. (1h25)/(1h32:30) There is currently a major gap in funding for medical care of CG retirees
A Better Armed Coast Guard: Not that the Representatives were specific, but there was a statement, “We want to weaponize you.” (5:55) I think I heard essentially a second time as well. I’m not sure what that means.
Rising Sea Levels: There was concern expressed regarding rising sea level and how they might impact shore facilities (1h12:20)
WMEC Service Life Extension: The Coast Guard was given money several years ago to plan a service life extension program for 270. The Congress has not seen or heard any result and they questioned, why delay? (1:09) See fig. 4 on page 17 of the GAO’s written testimony
Operating Expenses: Replacement ships are costing more.(26:25)(50:55). This is becoming problematic without an increase in operating budget.
Changing the way we buy ships: Included in the Reauthorization Bill are changes in the way the Coast Guard can fund its shipbuilding, putting us on par with the Navy (5:50)
Cyber: Budget includes 70 additional billets. (19:45) What are we doing for the ports? (1h13:45)
Inland Tender Fleet: Budget includes $!M to investigate alternatives. (52:30) (1h19)
It is remarkable that there seemed to be no sentiment that the Coast Guard budget should be cut, while there was considerable evidence the Representatives believe the Coast Guard is underfunded.
One correction – GAO does not control budget submissions. The path is USCG to DHS to OMB to Congress. The “blockage” used to be at DOT/B-1. My guess is that it is most likely at the OMB level now. Historically, the Coast Guard has been unwilling to buck either the Dept or OMB.
This is one of the reasons for the lower than expected availability of the NSCs. It takes a ship ourt of service for a year, but it will not be necessary for later ships. http://www.dcms.uscg.mil/Our-Organization/Assistant-Commandant-for-Acquisitions-CG-9/Newsroom/NSC_071417/
There is this as well.
“Six NSCs are in service, with four based in Alameda, California, and two in Charleston, South Carolina. The seventh and eighth NSCs, Kimball and Midgett, will be stationed in Honolulu. The Kimball was christened in March 2017 and is scheduled for delivery in 2018. The Midgett will be christened in December 2017 and is scheduled for delivery in 2019.”
I have been looking for the Coast Guard’s Five and Twenty Year Plans and the Unfunded Priority List which were promised by the end of June, but have been unable to find them. Any body know anything about this?
anyone know where the 9th nsc is going? is there a possibility of a 10th? without raping the opc funding?
Don’t have anything official, but I suspect #9 would go to Honolulu. The FY 2018budget has money to empliment the “crew rotation concept, which originally envisioned three ships in each homeport.
We should find out pretty soon if there will be a #10, and it so I don’t expect it will have any immediate impact on the OPC, although it may impact the final number somewhere in the distant future.
what the navy should do is piggy back on NSC #9 or 10 and use it as a proof of concept for FF(X)/FF4923. By the time NSC10 is commissioned it will be time for NSC01 to be FRAMed.
I do think there would be value in prototyping an upgunned NSC, both for the Navy and for the CG.
Pingback: Coast Guard Sea, Land, and Air Capabilities, Part II, 25 July, 2017 | Chuck Hill's CG Blog